Job Description :
Fiber Optic/Electrical Engineer for the State of Georgia
Location: Atlanta GA
Duration: 4+ Months
Client: AIM- Aviation
Req Id: 56052

Scope of Work
1. Identification
Identify existing terminated and dark fiber in HJAIA AVS telecommunication room located lower level Concourse T adjacent to American Airlines Baggage Claim
Physically locate terminated fiber optic cabling endpoints, trace fiber cables as needed from AVS telecom room to identify both start/end points
Identify and document each endpoint of ISP/OSP fiber optic cable termination
Identify connected and dark fiber that can be reclaimed for use
2. Verify
Using a VFL, clean and verify both ends of all terminated fiber optic cables using available fiber, test available fiber strands that have a weak VFL signal to identify possible cause and provide a corrective action plan
Test TWO available fiber strands on each buffer tube fiber with OTDR to verify fiber strands are intact and serviceable for use and provide printed test results (OTDR must have been calibrated within 6 months, provide printed copy of calibration)
Clean and re-install dust covers on available fibers (provide dust covers as needed), verify cleanliness of connector end-face with fiber scope (provide DOA IT with 2each Fiber scopes with fiber adapters to verify work within 30 days after award)
3. Labeling
Label IT racks with DOA IT provided label scheme, as needed
Label both endpoint fiber patch panels and cross-connect patch panels of terminated fiber optic cabling (labeling scheme will be provided by DOA IT), fiber patch panel may have several fiber cables terminated in patch panel
Fiber Patch Panels shall be labeled on Outside and Inside of fiber panel door identifying each coupler panel endpoint location (also, if fiber patch panel has a pull-out label panel, it shall be labeled to identify each coupler panel) DOA IT will provide labeling scheme
Label all fiber optic patch cables from patch panel to equipment on both ends (Panduit Flag Labels p/n F100X150AJC or F100X150AJT on all fiber patch cables)
Label existing installed fiber cable 6-12” from patch panel and service loops with highly visible self-laminating fiber labels (no hand-written labels are allowed anywherePanduit PST-FO labels) DOA IT to provide label scheme
Provide to DOA AVS, 2 each Panduit LS8 handheld printers (p/n LS8EQ-KIT-ACS) within 30 days after award
4. Documentation
Contractor to provide three (3) possible fiber optic documentation software to document all fiber optic endpoint locations and terminations (software and license will be provided to DOA AVS department once software it is evaluated and approved by AVS)
Document fiber optic cable using documentation software:
Type-SM/MM 50/62. 5
Cable jacket type
Strand count
Termination connector type
Both end points (location, room #, special notes)
Document “splice taps” locations (if documentation can be provided by DOA) and fiber strand numbers/buffer tubes
Document all fiber optic connections from patch panel to equipment (format TBD)
Document fiber strands available for use
Document service loop locations and slack length in telecom rooms
Document fibers that can be reclaimed for use
5. Deliverables to be provided within thirty (30) days after award
Section 2C: provide DOA IT with 2 each Fluke Fiber Inspector scopes (FI-500) with fiber adapters
Section 3G: provide to DOA AVS, 2 each Panduit LS8 handheld printers (p/n LS8EQ-KIT-ACS)
Section 4a: provide fiber optic documentation software (TBD) and license registered to the City of Atlanta – Department of Aviation – AIM IT
Provide Exfo OTDR 1MAX-720C-Q1-QUAD-OTDR-EI-EIEUI-91-EI-EU-FR2-SPS B-B-150-88-91-SPSB-C-300-54-54-GP-152-GP-10-061) , 1-FIPT-400-LC-K-UPC, 1-FIPT-400-SCA-K (see Graybar quote complete details)

Client : State of Georgia