Job Description :
Skill
Cat 5E/6 network cable installation experience including terminating and testing.
Network cable termination at patch panel and jack location, know the difference between 568a and 568b.
Able to lift / cary 50 lbs of tools.
Able to climb ladders ( up to 12ft) and work pulling cable on them.
Use power tools to install cabling.
Start work at 4:00AM when needed to get to job site and work after 5:00PM. Work overnight as needed to complete the job.
Use of LAN and voice test equipment and tone sets to verify cabling.
Moderate experience installing, configuring and troubleshooting network equipment such as layer 2 and layer 3 LAN switches.
Fiber Optic Cabling experience including installation, termination and testing.